Application of Segmental Prefabrication Method in Railway Bridge Construction

Mengen, Song (2023) Application of Segmental Prefabrication Method in Railway Bridge Construction. Journal of Engineering Research and Reports, 24 (12). pp. 115-119. ISSN 2582-2926

[thumbnail of Mengen24122023JERR99120.pdf] Text
Mengen24122023JERR99120.pdf - Published Version

Download (115kB)

Abstract

Segmental prefabrication construction method is a bridge construction technology that divides a span bridge into several segments along the axis direction, prefabricated in batch at the beam yard and transported to the construction site for assembly. This method has been gradually popularized for its advantages of rapid construction, green environment protection and strong adaptability. In this paper, the application status of this method at home and abroad, the key points of construction technology are summarized, and the technical characteristics, advantages and disadvantages are summarized, so as to provide a reference for the project using this method.

Item Type: Article
Subjects: ScienceOpen Library > Engineering
Depositing User: Managing Editor
Date Deposited: 24 Apr 2023 04:36
Last Modified: 03 Oct 2024 03:59
URI: http://scholar.researcherseuropeans.com/id/eprint/1063

Actions (login required)

View Item
View Item